China Shipbuilding
  | 
   跳过导航链接
Shipyard
Ship Building展开 Ship Building
 Ship Building | Bulk Carrier | Container Ship | Oil Tanker | Offshore & Support Vessel | Gas Carrier |  Specialised & Others Vessel
 
 
 Keppel Nantong
 Guangzhou Shipyard Intl. (GSI)
 Huangpu-Wenchong Shipbuilding
 
 

50,000 DWT Semi-submersible Heavy Lift Vessel -- Designed by Marine Design & Research Institute of China

The vessel is designed to be a self propelled, electric driven semi- submersible heavy lift vessel for worldwide operations. It can be used for salvaging and transporting various types of ships,equipment, aircraft, etc which are distressed on the sea. Especially, it can salvage large ships which have 80,000 tonnes` deadweight. It is capable to load and discharge via the float on /float off method floating objects like offshore rigs, dredging equipment, barges, floating plants...

The vessel to be of all welded steel construction., have no bulbous bow, equipped with three Azimuth pod propulsion and DP2 system. Two buoyancy casings are provided above main deck at stern, superstructure to be located at forward.

 
MAIN PARTICULAR
- Length (o.a.):  abt. 228.0 m
- Length (b.p.):       224.0 m
- Breadth moulded:      43.0 m
- Depth moulded:        13.5 m
- Designed Draught:     10.0 m
- Load Draught:         10.3 m
- Submerged Draught:    26.0 m
- Service Speed:         14 Kn
- Dead Weight:    47,900 t (Load Draught)

COMPLEMENT: 56 P

ENDURANCE:  15,000 n. miles

CLASSIFICATION
- CCS*CSA*CSM,Semi-submersible Heavy lift Vessel, Ice Class B, In- water Survey, AUT-0,PR-2S,DP-2
 
TANK CAPACITY
- Water Ballast: 107,000 m³
- HFO:             4,100 m³
- MDO:               500 m³
- MGO:               480 m³
- Water Ballast:     300 m³
- Potable Water:     350 m³
- Lube. Oil:         160 m³

MAIN EQUIPMENT

- Azimuth pod propulsion: 4,500 kW x 3
- Tunnel bow thrusters:   2,750 kW x 2

POWER SUPPLY
- Main generator:      4 x 5,760 KW,   750 r/min
- Auxiliary generator: 1 x 1,150 kW, 1,000 r/min
- Emergency Generator: 1 x   500 kW, 1,500 r/min
- DP2 System: 1 sets


Orderbook   (* the orderbook for reference only, details please contact with the shipyard !)
No.Ship's Name / Hull No.Vessel TypeOwner CompanyShipyardDeliveryContract Date
1Vard Langsten 977Diving Support Vessel, 120 m.loaIsland Offshore Management ASVard Braila, Braila2027 - 012024 - 06
2Jana 507Accommodation Platform, 118 berthsAl Rashed & Sons GroupQingdao Haixi Heavy-Duty Machinery2025 - 062024 - 05
3MagdalenaTrailing Suction Hopper Dredger, 2,105 tonsBoer BaggerbedrijfIHC Holland, Kinderdijk2026 - 052024 - 01
4Vard TulceaCable LayerToyo KensetsuVard Tulcea2026 - 052023 - 12
5Oceanus 1Cable LayerCO-Asia Marine TechnologyPacific Shipbuilding JSC2025 - 072023 - 10
6IHC Holland CO01317Trailing Suction Hopper DredgerBoskalisIHC Holland2026 - 042023 - 10
7Fleeming JenkinCable LayerJan De Nul NV GroupChina Merchants (Haimen)2026 - 062023 - 09
8Nexans ElectraCable LayerNexans Norway ASUlstein Verft2025 - 012023 - 09
9Fan Zhou 8Heavy Load Carrier, 55,000 tonsJiangsu Fanzhou ShippingTaizhou Zhonghang Shipbuilidng2024 - 122023 - 09
10Zhenhua ZPMC1133Crane VesselChina Communications Construction (中国交通建设)Shanghai Zhenhua HI2024 - 092023 - 07
11Zhenhua ZPMC1128Crane VesselCRCC Harbour & Channel EngineeringShanghai Zhenhua HI2024 - 112023 - 06
12Jana 505Accommodation PlatformAl Rashed & Sons GroupQingdao Haixi Heavy-Duty Machinery2025 - 012023 - 06
13Jana 509Accommodation PlatformAl Rashed & Sons GroupQingdao Haixi Heavy-duty Machinery2025 - 032023 - 06
14Jana 508Accommodation PlatformAl Rashed & Sons GroupQingdao Haixi Heavy-duty Machinery2025 - 022023 - 06
15Taizhou Kouan TKH2077Wind Turbine Installation PlatformShanghai Tengdong Yubo ShippingTaizhou Kouan Shipbuilding2024 - 072023 - 04
16FrejaCable LayerNCT Offshore A/SUnknow Shipyard2024 - 122023 - 03
17SvyatogorIcebreakerRussia GovtOAO Sudostroitelnaya Firma2027 - 122023 - 03
18San Hang Xiang AnCrane VesselChina Communications Construction (中国交通建设)Jiangsu Dajin HI2024 - 072023 - 03
19Shanghai ZhenhuaWind Turbine Installation VesselHuaxia Financial Leasing (华夏租赁)Shanghai Zhenhua HI2026 - 042023 - 03
20Shanghai ZhenhuaWind Turbine Installation VesselHuaxia Financial Leasing (华夏租赁)Shanghai Zhenhua HI2025 - 122023 - 03
21StalingradIcebreaker, 6,769 tonsRussia GovtAO Baltiyskiy Zavod2030 - 122023 - 03
22LeningradIcebreaker, 6,769 tonsRussia GovtAO Baltiyskiy Zavod2028 - 122023 - 03
23CIMC Raffles H606Wind Turbine Installation PlatformCRCC Harbour & Channel EngineeringYantai CIMC Raffles Shipyard2024 - 112023 - 02
24Jiangmen Hangtong HTJ23216Accommodation ShipRawabi HoldingsJiangmen Hangtong Shipbuilding2024 - 112023 - 02
25Sefine 68Cable Layer, 8,600 tonsAgalas ASSefine Shipyard2025 - 032023 - 01
Records: 98,   Page: 1  2  3  4  



Want to build this vessel? Please leave your message & contact detail here:
 