The vessel is a 115m Diesel Electric Construction Support Vesselto be designed and constructed as a construction support vessel, with function of construction / accommodation / maintenance / installation / ROV / diving support to offshore projects.The vessel to have a raked stem with bulbous bow, transom stern and twin Azimuth propellers.The ship to be built for world wide operation, except US inland waters, and similar areas withspecial restrictions and requirements.The vessel to be completely outfitted and equipped with external fire-fighting system, helideck with H type light system , 300T main crane, 65T aux. crane withpersonnellifting ,moonpool, and telescopic access bridge .The vessel to be designed transportation of deck cargo and personnel between offshore platform and shore baseand accommodated 300 persons..The vessel to be met DP3 and Safety Return To Port requirements.
PRINCIPAL PARTICULARS
- Length overall: 115.00 m
- Scantling draught: 6.50 m
- Beam moulded: 28.00 m
- Depths moulded: 9.00 m
- Depth moulded: 6.00 m
ACCOMMODATION
The Vessel to be arranged with accommodation for a crew of 300persons, arranged as follows:
- 1st Deck : 6off 4-man cabins
- 2nd Deck: 20off 4-man cabins
- 3rd Deck: 16off 2-man cabins; 16 off 4-man cabins
- 4th Deck: 32off 2-man cabins;
- 5th Deck: 28single cabins
Builder:CSSC Huangpu Wenchong Shipbuilding Co., Ltd
- The vessel have get the ABS complete certificate in Dec 2016,
- Mantenance is carried out at yard wharf.